Conghua electroplating reuse system

Conghua electroplating reuse system

  • Category:CASE
  • Clicks:
  • Time:2025-10-14
  • Overview

Project name: Reclaimed water reuse + metal recycling treatment system in electroplating industrial park

Processing capacity: 2000m3/day

Project Overview: Located in Conghua, Guangzhou, in order to solve the problem of excessive heavy metals in sewage and water restrictions, the reclaimed water reuse and heavy metal recovery system has been adopted to realize the recovery and purification of heavy metals and then return to the plating tank and water reuse, with a reclaimed water reuse rate of 70%, and have achieved good benefits in energy conservation and emission reduction.


Reverse osmosis reclaimed water reuse system reuse process

a355ae56-54ba-465e-9245-b4115c75a61e.jpg


Water quality data

projectCODPHSSTurbidityColorConductivity
Before processing≤809≤39≤15≤253
After processing≤245085------

Note: The heavy metal recycling data is confidential and the owner refuses to provide it.